L2/02-252R3

Unicode Technical Committee meeting times:

    Tuesday, August 20            10 am to 5 pm
    Wednesday, August 21       9 am to 5 pm
    Thursday, August 22           9 am to 5 pm
    Friday, August 23               9 am to 1 pm

L2 Plenary meeting time:

    Friday, August 23               1 pm to 5 pm

Scheduled discussions



A. Administrative Issues

A.1 UTC membership roll call
  A.1.1 Call for proxies
  A.1.2 Roll call

A.2 Declaration of joint meeting

A.3 Registration of new documents

A.4 Approval of joint meeting agenda
Latest version of this document [L2/02-252]

A.5 Minutes and action items
  A.5.1 Approval of minutes of Joint Meeting UTC 90/L2 187 [L2/02-166]
  A.5.2 Review of open action items [L2/SD2]
Minutes posted at www.unicode.org/unicode/consortium/utc-minutes.html

A.6 Calendar Review

  UTC 93/L2 190 - November 5-8, 2002, Nashua, NH, Compaq Annual Members Mtg
  UTC 94/L2 191 - March 4-7, 2003, Mountain View, Microsoft
  UTC 95/L2 192 - June 3-6, 2003, Bay Area, Adobe
  UTC 96/L2 193 - August 19-22, 2003, Bay Area, host TBD
Calendar posted at www.unicode.org/unicode/timesens/calendar.html


B. Liaison Reports and Technical Topics

B.1  WG2
  B.1.1 Convenor's Report [Ksar]
  B.1.2 Liaison Report [Freytag, Whistler, L2/02-291]
  B.1.3 WG2 - Action Items [Umamaheswaran]
  B.1.4 Draft minutes of WG 2 meeting 42 (Dublin) [Umamaheswaran]
  B.1.5 IRG Report [L2/02-234]
  B.1.6 Clarification of relations between UCS-4 and different transformation formats [L2/02-235]
  B.1.7 Working Draft ISO/IEC 10646: 2003 [Suignard, L2/02-282]
  B.1.8 WG2 Consent Docket [Whistler, L2/02-292]
  B.1.9 FPDAMs, Part 2, Amendment 1; Part 1, Amendment 2 [Suignard, L2/02-296, 300]

B.2  WG20
  B.2.1 Convenors Report [Winkler, L2/02-256]
  B.2.2 Liaison Report [Whistler, L2/02-251]
  B.2.3 WG20 Meeting #22 Resolutions [L2/02-239]
  B.2.4 WG20 Meeting #22 Minutes [L2/02-240]
  B.2.5 CLAUI [L2/02-248]
  B.2.6 ISO/IEC 14651 [L2/02-270, 271]

B.3 IRG
  B.3.1 Liaison Report [Jenkins]

B.4 TC304/CDSG/CEN
  B.4.1 Liaison Report [Ksar]
  B.4.2 Draft Report on I18N Standardization [Ksar]

B.5 IETF
  B.5.1 Liaison Report [McGowan]

B.6 W3C
  B.6.1 Liaison Report [Davis, L2/02-220]
  B.6.2 Early Uniform Normalization

B.7 NCITS/H2 – SQL
  B.7.1 Liaison report [Birdsall]

B.8 INFITT
  B.8.1 Liaison report [Kaplan, L2/02-309, 310]

B.9 Unicode Technical Reports, Standards, and Standard Annexes
  B.9.1 Unicode Technical Standard #6 A Standard Compression Scheme for Unicode
    B.9.1.1 Proposal to add another conformance clause [Scherer, L2/02-262]
  B.9.2 Unicode Technical Standard #10: Unicode Collation Algorithm
    B.9.2.1 Proposals for the 4.0 time frame [Davis, L2/02-280; Kim, L2/02-308]
      B.9.2.1.1 UCA and preliminary scripts
  B.9.3 Unicode Annex #15: Unicode Normalization
    B.9.3.1 Include text from Unicode Tech Note #5 Canonical Equivalence in UAX#15 [Scherer, L2/02-289]
  B.9.4 Draft Unicode Technical Report #29 Text Boundaries, open issues [Davis, L2/02-304]
    B.9.4.1 Better Handling of Apostrophe [Cimarosti, L2/02-303]

B.10 Editorial Committee
  B.10.1 Unicode 4.0
  B.10.2 Unicode Technical Notes
  B.10.3 Policies update [Davis]
  B.10.4 Editorial actions [Davis]

B.11 Scripts, New Characters
  B.11.1 Devanagari (TDIL Newsletter January 2002, extracted pages 26-37) [McGowan (Gov't of India), L2/02-268]
  B.11.2 Thesaurus Linguae Graecae Proposal for Greek Paleographic additions [Pantelia, L2/02-273, 287, 312-318]
  B.11.3 Kharoshthi [Glass, Baums, L2/02-203R]
  B.11.4 Egyptian Hieroglyphics, Gardiner set [Everson, L2/02-288; Snell, L2/02-281; Rocchi L2/02-295; Green, Hornug L2/02-290]
  B.11.5 FBXX Ligatures [Overington, L2/02-286]
  B.11.6 Proposal to add Dashes [Muller, L2/02-277]
  B.11.7 VERTICAL LINE EXTENSION character [Muller, L2/02-278]
  B.11.8 Arabic extensions [Kew, L2/02-274]
  B.11.9 Koranic alternates [Kew, L2/02-275]

B.12 Properties
  B.12.1 Property file changes for UCD 3.2.1 [Davis, L2/02-267R3; Whistler, L2/02-270]
  B.12.2 Soft hyphen [Muller, L2/02-279]
  B.12.3 Default ignorable discussion from AI 91-79, 80
  B.12.4 Bidi issues [Davis, L2/02-194]

B.13 Draft disposition of comments and draft FDIS Text for the Revision of ISO/IEC 2375 [Hart, Aliprand, L2/02-261]

B.14 Assessing Unicode Support [Davis, L2/02-305]

B.15 GB 18030 FAQ



C. Miscellaneous



D. Close of Joint Meeting

D.1. Review of UTC motions (recommendations to L2) [L2/02-254]

D.2. UTC position on current ballots [Wissink]

D.3. Review of action items from this meeting [L2/SD2]

D.4. Closing of joint meeting